Advanced Load Dispatch for Power Systems: Principles, Practices and Economies

Overview

The balancing of power generation with load in power systems is a vital and delicate task. Power system demands vary according to the time of day and time of year, and the load generation balance has always to be done with due regard to economy as well as to the security and safety of the system. This text comprehensively covers the various aspects of load dispatching, including telecommunication and other facilities, operating reserves, load management, inter-system exchanges, security and reliability, and load ...
See more details below
Paperback (Softcover reprint of the original 1st ed. 1997)
$129.00
BN.com price
Other sellers (Paperback)
  • All (6) from $95.61   
  • New (5) from $95.61   
  • Used (1) from $164.88   
Sending request ...

Overview

The balancing of power generation with load in power systems is a vital and delicate task. Power system demands vary according to the time of day and time of year, and the load generation balance has always to be done with due regard to economy as well as to the security and safety of the system. This text comprehensively covers the various aspects of load dispatching, including telecommunication and other facilities, operating reserves, load management, inter-system exchanges, security and reliability, and load forecasting practices. The principl es described are illustrated by examples from North America, Europe, and India, thus giving coverage to systems in both developed and developing countries.
Read More Show Less

Product Details

  • ISBN-13: 9781447112518
  • Publisher: Springer London
  • Publication date: 7/31/2012
  • Series: Advances in Industrial Control Series
  • Edition description: Softcover reprint of the original 1st ed. 1997
  • Edition number: 1
  • Pages: 229
  • Product dimensions: 6.14 (w) x 9.21 (h) x 0.54 (d)

Table of Contents

1. Introduction.- 1.1 Development of Interconnected Power Systems.- 1.2 Benefits of Operation of Interconnected Power Systems.- 1.2.1 Reduction in Generating Capacity Due to the Diversity of Load Demands.- 1.2.2 Reduction in Standby Capacity.- 1.2.3 Increase in the Size of Generating Sets.- 1.2.4 Optimum Utilisation of the Available Plant Capacity and Transmission Facilities.- 1.2.5 Reliability of Power Supply.- 1.2.6 Improvement in Frequency.- 1.3 Developing and Developed Systems.- 1.3.1 India.- 1.3.2 UCPTE.- 1.3.3 Indian Grid Systems.- 1.3.4 The UCPTE System.- 1.4 Human Factors in the Operation of Interconnected Power Systems.- 1.4.1 Mutual Trust.- 1.4.2 Understanding Problems Peculiar to Constituents.- 1.4.3 Effective Communication.- 2. Objectives, Functions and Location of Load Dispatch Centres.- 2.1 Objectives.- 2.2 Operational Planning.- 2.3 Functions.- 2.3.1 Programming.- 2.3.1.1 Load Forecasting.- 2.3.1.2 System reserve.- 2.3.1.3 Daily generation scheduling.- 2.3.1.4 Reactive power.- 2.3.2 System Monitoring.- 2.3.3 System Control.- 2.4 Hierarchical Set-Up of Load Dispatch Centres.- 2.4.1 Great Britain.- 2.4.2 France.- 2.4.3 India.- 2.5 Location of Load Dispatch Centres.- 3. Facilities at Load Dispatch Centres.- 3.1 Equipment and General Arrangement.- 3.2 Building.- 3.3 Control Room.- 3.3.1 Mosaic Diagram.- 3.3.2 Computerised Display.- 3.3.3 Control Desks and Instrument Consoles.- 3.4 Computer System.- 3.5 Teleprinter Facilities.- 3.6 Weather Information System.- 3.7 Operational Data Logging.- 3.7.1 Service Logs and Records.- 3.7.2 Loading Log.- 3.7.3 Measured Value Log.- 3.7.4 Switching Log.- 3.7.5 Generation Plant Availability.- 3.7.6 Energy Generation.- 3.7.7 Inter-System Energy Transfers.- 3.7.8 Reservoir Levels, Inflows, etc..- 3.7.9 Fuel Consumption and Sks.- 3.8 Auxiliary Power Supply.- 3.8.1 DC Battery System.- 3.8.2 AC Stabilised Supply.- 3.8.3 Uninterruptible Power Supply (UPS).- 3.8.4 Diesel-Generator Set.- 3.8.5 HVAC System.- 3.8.6 A Case Study.- 3.9 Training of System Operators.- 3.9.1 General.- 3.9.2 Placement of Staff.- 3.9.3 Training Facilities.- 3.9.3.1 Workshops.- 3.9.3.2 Simulator Training.- 3.9.3.3 Computer-based training (CBT).- 4. Telecommunications in Power System Operation.- 4.1 General.- 4.2 Communication Systems.- 4.2.1 Power Line Carrier Communication (PLCC).- 4.2.2 Microwave Communication.- 4.2.3 Leased Telephone Circuits.- 4.2.4 Fibre Optic Communication.- 4.2.4.1 Optical Fibres.- 4.2.4.2 Numerical Aperture.- 4.2.4.3 Techniques of Installing Fibre Optic Cable.- 4.2.5 Satellite Communication.- 4.3 Practices in Some Countries.- 4.4 Role of Communications in Load Dispatch Centres.- 4.4.1 Teleprinting.- 4.4.2 Telesignalling and Remote Control.- 4.4.3 Telemetering.- 4.5 Telemetering Systems.- 4.5.1 Analog Telemetering.- 4.5.1.1 Continuous Telemetering.- 4.5.1.2 Selective analog.- 4.5.2 Digital Telemetering.- 4.5.2.1 Digital Cyclic Telemetering.- 5. Determination of Operating Reserve.- 5.1 General.- 5.2 Availability of Generating Units.- 5.2.1 Availability of a Single Generating Unit.- 5.2.2 Availability of a Set of Generating Units.- 5.3 Load Uncertainty Distribution.- 5.3.1 Load Forecast Errors.- 5.3.2 Random Fluctuations of Load.- 5.4 Determination of Necessary Reserve.- 5.5 Classification and Assessment of Reserve.- 5.6 Assignment of Reserve to Various Units and Resources.- 5.7 UCPTE Philosophy.- 6. Load-Generation Balance.- 6.1 Introduction.- 6.2 Short-Term Scheduling.- 6.2.1 Thermal Power Systems.- 6.2.1.1 Unit commitment.- 6.2.1.2 System incremental cost grid.- 6.2.1.3 Determination of hydro generation.- 6.2.1.4 Determination of generation-pumping diagrams of pumped storage power stations.- 6.2.1.5 Determination of thermal generation diagrams.- 6.2.1.6 Split saving.- 6.2.2 Hydro Power Systems.- 6.2.2.1 Assigned reservoir generations.- 6.2.2.2 Assigned medium-term water values.- 6.2.3 Hydro-Thermal Power Systems.- 6.2.4 A New Framework of Scheduling Procedures.- 6.2.5 Conclusions.- 6.3 Medium-Long Term Operation Planning Ill.- 6.3.1 Definition of Some Key Concepts.- 6.3.1.1 Value of reliability.- 6.3.1.2 Firm and non-firm energy.- 6.3.1.1 Cost and revenue functions or curves.- 6.3.1.2 Elementary time interval (or time stage) in medium-long term operation planning.- 6.3.1.3 Value of water.- 6.3.2 Operations planning in randomness.- 6.3.2.1 Operation strategy or closed loop.- 6.3.2.2 Operation policy or open loop.- 6.3.2.3 Deterministic computations.- 6.3.2.4 Comparison of closed loop and open loop methodologies.- 6.3.2.5 Conclusion.- 6.3.3 Methodologies in Use in Some Utilities.- 6.3.3.1 Purely hydro (thermal energy generation less than 15% of the load).- 6.3.3.2 Hydro-thermal (hydro and thermal generation not less than 15% each).- 6.3.3.3 Purely thermal (thermal generation higher than 85.- 6.3.4 Conclusions.- 7. Load Management and Methods of Meeting Peak Demand.- 7.1 General.- 7.2 Flattening of Load Curve.- 7.2.1 Differentiation of Tariffs.- 7.2.2 Ripple Control.- 7.2.3 Under — Voltage Operation.- 7.3 Characteristics of Loads.- 7.4 Measures For Load Management.- 7.5 State-Of -The-Art in the USA.- 7.6 Swedish Project to Optimise Energy Consumption Pattern.- 7.7 Methods of Meeting Peak Demand.- 7.8 Pumped Storage Plant.- 7.8.1 Advantages and Storage Cycles.- 7.8.1.1 Daily Storage Cycle.- 7.8.1.2 Weekly Storage Cycle.- 7.8.1.3 Seasonal Storage Cycle.- 7.8.2 Types of Pumped Storage Equipment.- 8. Security and Reliability of Energy Control Systems.- 8.1 Introduction.- 8.2 Organisation.- 8.2.1 Structure of the ECS.- 8.2.2 Role of Man.- 8.3 Administration.- 8.3.1 Formulation of Orders and Instructions.- 8.3.1.1 The Operational or decision sub-system.- 8.3.1.2 The Information sub-system.- 8.3.1.3 The Executive sub-system.- 8.3.2 Data Base.- 8.3.3 Quality of Documentation.- 8.4 Equipment.- 8.4.1 Role and Principal Components of Equipment.- 8.4.2 The Information System.- 8.4.3 The Decision System (Fig. 8.1).- 8.4.4 The Executive System (Fig. 8.1).- 8.4.4.1 Permanent Automatic Control.- 8.4.4.2 Power System Protective Arrangements.- 8.4.4.3 Operating and Switching remote control equipment.- 8.4.5 Conceptual Criteria For ECS.- 8.4.5.1 Reliability and security.- 8.4.5.2 Response time.- 8.4.5.3 Expandability and Adaptability of the ECS.- 8.4.6 Main Phases of Implementation of An ECS.- 8.4.6.1 User’s specifications.- 8.4.6.2 Development of software.- 8.4.6.3 Auxiliary equipments.- 8.4.6.4 Premises and buildings.- 8.5 Conclusions.- 9. Inter-System Exchanges, Tariffs and Billing.- 9.1 General Principles of Power Exchanges.- 9.1.1 Programming.- 9.1.2 Frontier Point.- 9.1.3 Inadvertent Exchange.- 9.1.4 Billing.- 9.1.5 Bonus or Penalty Factors for Regulation.- 9.1.6 Modification of the Programmes During Operation.- 9.1.7 Control of Exchanges.- 9.1.8 Tariff for Inadvertent Exchanges.- 9.2 Power Exchanges in the UCPTE Countries.- 9.2.1 Pattern of Exchanges.- 9.2.1.1 Energy exchanges and Accounting.- 9.3 Power Pooling and Interchanges in the Usa.- 9.3.1 Operating Hierarchy.- 9.3.2 Typical Interchange Transactions.- 9.3.2.1 Central dispatch.- 9.3.2.2 Sequential dispatch.- 9.3.2.3 Broker dispatch.- 9.3.3 Scheduling, Billing and Accounting.- 9.3.3.1 Scheduling.- 9.3.3.2 Pricing.- 9.3.3.3 Billing for interchange transactions.- 9.3.3.4 Accounting Practice.- 9.3.3.5 Wheeling of power.- 9.4 Banking Transactions and Barter Deal.- 9.4.1 Banking Transactions.- 9.4.1.1 Accounting of the banked energy.- 9.4.1.2 Tariff For Banked Energy.- 9.4.2 Barter Deals.- 9.5 New Organisational Structures.- 9.5.1 Structural Organisation of the Functions of the Electricity Supply Industry.- 9.5.2 Ancillary Services.- 9.5.3 Third Party Access.- 9.5.4 Security of Interconnection.- 9.5.5 Marketing of Electrical Energy.- 9.5.6 Current Status of Application of New Structures and Functions.- Appendix 1: Present Practices in Load Forecasting.- 1. Introduction.- 2. Time Spans.- 3. General Characteristics.- 4. Objectives of Load Forecasting.- 5. Parameters Influencing Load Forecasts.- 5.1 Main Parameters.- 5.2 Meteorological Factors.- 5.3 Special Events.- 6. Methods.- 6.1 Load Forecasting in Practice.- 7. Data and Hardware.- 7.1 Characteristics of the data.- 7.2 Maintenance and Collection of Data.- 7.3 Period considered.- 7.4 Computational Means.- 8. Medium-Long Term.- 9. Short-Term.- 10. Very Short-Term.- 11. Related Issues.- 11.1 Share of load forecast among load buses.- 11.2 MV Ar Demand.- 11.3 Monitoring the Errors.- 12. User’s Opinion.- 13. Conclusions and Recommendations.- Appendix 2: (Reference Chapter 6 — Load-Generation Balance).- Appendix A.- 1. Partitioning of Time in the Scheduling Problems.- 2. Simplifications.- 3. Categorisation of Generation, Load and Power Exchanges.- 4. Constraints.- 5. Criteria of Optimisation.- 5.1 First case: no hydro storage (or “purely thermal”).- 5.2 Second case: no thermal generation (or “purely hydro”).- 5.3 Third case: hydro-thermal power system.- 5.4 Fourth case: no market opportunity.- 5.5 Fifth case: purely hydro, no opportunity exchanges, no secondary load.- 6. Value of Water.- 6.1 Medium term water value.- 6.2 Short-term water value.- 7. Cost Function and Revenue Function.- 7.1 Thermal generation plus opportunity import (cost).- 7.2 Secondary load plus opportunity export (revenue).- 7.3 Combining the two functions.- Appendix B.- Appendix C.- Appendix D.- Appendix E.
Read More Show Less

Customer Reviews

Be the first to write a review
( 0 )
Rating Distribution

5 Star

(0)

4 Star

(0)

3 Star

(0)

2 Star

(0)

1 Star

(0)

Your Rating:

Your Name: Create a Pen Name or

Barnes & Noble.com Review Rules

Our reader reviews allow you to share your comments on titles you liked, or didn't, with others. By submitting an online review, you are representing to Barnes & Noble.com that all information contained in your review is original and accurate in all respects, and that the submission of such content by you and the posting of such content by Barnes & Noble.com does not and will not violate the rights of any third party. Please follow the rules below to help ensure that your review can be posted.

Reviews by Our Customers Under the Age of 13

We highly value and respect everyone's opinion concerning the titles we offer. However, we cannot allow persons under the age of 13 to have accounts at BN.com or to post customer reviews. Please see our Terms of Use for more details.

What to exclude from your review:

Please do not write about reviews, commentary, or information posted on the product page. If you see any errors in the information on the product page, please send us an email.

Reviews should not contain any of the following:

  • - HTML tags, profanity, obscenities, vulgarities, or comments that defame anyone
  • - Time-sensitive information such as tour dates, signings, lectures, etc.
  • - Single-word reviews. Other people will read your review to discover why you liked or didn't like the title. Be descriptive.
  • - Comments focusing on the author or that may ruin the ending for others
  • - Phone numbers, addresses, URLs
  • - Pricing and availability information or alternative ordering information
  • - Advertisements or commercial solicitation

Reminder:

  • - By submitting a review, you grant to Barnes & Noble.com and its sublicensees the royalty-free, perpetual, irrevocable right and license to use the review in accordance with the Barnes & Noble.com Terms of Use.
  • - Barnes & Noble.com reserves the right not to post any review -- particularly those that do not follow the terms and conditions of these Rules. Barnes & Noble.com also reserves the right to remove any review at any time without notice.
  • - See Terms of Use for other conditions and disclaimers.
Search for Products You'd Like to Recommend

Recommend other products that relate to your review. Just search for them below and share!

Create a Pen Name

Your Pen Name is your unique identity on BN.com. It will appear on the reviews you write and other website activities. Your Pen Name cannot be edited, changed or deleted once submitted.

 
Your Pen Name can be any combination of alphanumeric characters (plus - and _), and must be at least two characters long.

Continue Anonymously

    If you find inappropriate content, please report it to Barnes & Noble
    Why is this product inappropriate?
    Comments (optional)