Overview

An easy-to-follow guide to the theory and practice of project scheduling and control

No matter how large or small the construction project, an efficient, well-thought-out schedule is crucial to achieving success. The schedule manages all aspects of a job, such as adjusting staff requirements at various stages, overseeing materials deliveries and equipment needs, organizing inspections, and estimating time needs for curing and settling—all of which requires a deep understanding on the part of the scheduler.

Written by a career construction professional, Construction Project Scheduling and Control, Second Edition has been fully revised with up-to-date coverage detailing all the steps needed to devise a technologically advanced schedule geared toward streamlining the construction process. Solved and unsolved exercises reinforce learning, while an overview of industry standard computer software sets the tone for further study. Some of the features in this Second Edition include:

  • Focus on precedence networks as a viable solution to scheduling, the main part of project control
  • The concepts of Dynamic Minimal Lag, a new CPM technique developed by the author
  • A new chapter on schedule risk management

By combining basic fundamentals with advanced techniques alongside the robust analysis of theory to enhance real-world applications, Construction Project Scheduling and Control is an ideal companion for students and professionals looking to formulate a schedule for a time-crunched industry in need of better ways to oversee projects.

Read More Show Less

Product Details

  • ISBN-13: 9780470505335
  • Publisher: Wiley
  • Publication date: 6/21/2010
  • Series: CourseSmart Series
  • Edition description: New Edition
  • Edition number: 2
  • Pages: 480
  • Sales rank: 645,406
  • Product dimensions: 7.70 (w) x 9.30 (h) x 1.20 (d)

Meet the Author

Saleh Mubarak, PhD, is Training Manager at the Qatar Project Management (QPM) Company in Doha, Qatar. A member of PMI and the PMI College of Scheduling, he served on the committee that created the PMI COS professional scheduler certification exam and is a former project controls manager with the Public Works Department of Hillsborough County in Tampa, Florida.

Read More Show Less

Table of Contents

Preface.

Preface to the First Edition.

Chapter 1 Introduction.

Planning and Scheduling.

Project Control.

Why Schedule Projects?

The Scheduler.

Scheduling and Project Management.

Chapter 1 Exercises.

Chapter 2 Bar (Gantt) Charts.

Definition and Introduction.

Advantages of Bar Charts.

Disadvantages of Bar Charts.

Chapter 2 Exercises.

Chapter 3 Basic Networks.

Definition and Introduction.

Arrow Networks.

Node Networks.

Comparison of Arrow and Node Networks.

Networks versus Bar Charts.

Time-Scaled Logic Diagrams.

Chapter 3 Exercises.

Chapter 4 The Critical Path Method (CPM).

Introduction.

Steps Required to Schedule a Project.

Supplemental Steps.

Resource Allocation and Leveling.

Beginning-of-Day or End-of-Day Convention.

The CPM Explained through Examples.

Logic and Constraints.

Chapter 4 Exercises.

Chapter 5 Precedence Networks.

Definition and Introduction.

The Four Types of Relationships.

The Percent Complete Approach.

Fast-Track Projects.

A Parallel Predecessor?

CPM Calculations for Precedence Diagrams.

Final Discussion.

Chapter 5 Exercises.

Chapter 6 Resource Allocation and Resource Leveling.

Introduction.

The Three Categories of Resources.

What Is Resource Allocation?

Resource Leveling.

Materials Management.

Chapter 6 Exercises.

Chapter 7 Schedule Updating and Project Control.

Introduction.

The Need for Schedule Updating.

Project Control Defined.

Schedule Updating.

Project Control.

Chapter 7 Exercises.

Chapter 8 Schedule Compression and Time-Cost Trade-Off.

Introduction.

Setting Priorities.

Accelerating a Project.

Direct and Indirect Costs.

Recovery Schedules.

Accelerating Projects Using Computers.

Potential Issues with Uncoordinated Project Acceleration.

Optimum Project Scheduling.

Chapter 8 Exercises.

Chapter 9 Reports and Presentations.

Introduction.

The Difference between Reports and Presentations.

Skills Necessary for Giving Good Presentations.

The Power of Presentation.

Reviewing Reports before and after Printing.

General Tips on Printing Reports.

Summary Reports.

Paper or Electronic Reports?

E-Reports.

Communications in the International Environment.

Chapter 9 Exercises.

Chapter 10 Scheduling as Part of the Project Management Effort.

Introduction.

Scheduling and Estimating.

Estimating and Accounting.

Scheduling and Accounting.

Scheduling and Change Orders.

Paperless Project Management.

Procurement Management.

Management of Submittals.

The Master Schedule and Subschedules.

Multiproject Management.

Time Contingency and Management Options.

Chapter 10 Exercises.

Chapter 11 Other Scheduling Methods.

Introduction.

Program Evaluation and Review Technique (PERT).

Graphical Evaluation and Review Technique (GERT).

Linear Scheduling Method (LSM).

Chapter 11 Exercises.

Chapter 12 Dynamic Minimum Lag Relationship.

Introduction.

Why DML?

Similarity of DML Concept with Linear Scheduling Method (LSM).

How Does the DML Work?

DML Relationship in the CPM calculations.

Can the Lag in the DML Relationship Be a Percentage?

Conclusion.

Chapter 12 Exercises.

Chapter 13 Construction Delay and Other Claims.

Methods of Schedule Analysis.

Chapter 13 Exercises.

Chapter 14 Schedule Risk Management.

Introduction.

Types of Risk in Construction Projects.

Schedule Risk Types.

Definition of Risk Terms.

Importance of Good Planning for Risk Management.

Importance of Good CPM Scheduling Practices for Risk Assessment.

Risk Shifting in Contracts.

Schedule Risk Management Steps.

Expected Value.

Application in Scheduling.

Examples of Risk Adjustment.

Conclusion.

Chapter 14 Exercises.

Appendix A Computer Project.

General Guidelines.

Cost Loading.

Updating the Project.

Change Order.

Resource Leveling.

Schedule Compression.

Schedule Compression 2.

Delay Claim 1: Unforeseen Conditions.

Delay Claim 2: Change in Owner's Requirements.

Appendix B Sample Reports.

Tabular Reports.

Graphic Reports.

Abbreviations.

Glossary.

References.

Bibliography.

Index.

Read More Show Less

Customer Reviews

Be the first to write a review
( 0 )
Rating Distribution

5 Star

(0)

4 Star

(0)

3 Star

(0)

2 Star

(0)

1 Star

(0)

Your Rating:

Your Name: Create a Pen Name or

Barnes & Noble.com Review Rules

Our reader reviews allow you to share your comments on titles you liked, or didn't, with others. By submitting an online review, you are representing to Barnes & Noble.com that all information contained in your review is original and accurate in all respects, and that the submission of such content by you and the posting of such content by Barnes & Noble.com does not and will not violate the rights of any third party. Please follow the rules below to help ensure that your review can be posted.

Reviews by Our Customers Under the Age of 13

We highly value and respect everyone's opinion concerning the titles we offer. However, we cannot allow persons under the age of 13 to have accounts at BN.com or to post customer reviews. Please see our Terms of Use for more details.

What to exclude from your review:

Please do not write about reviews, commentary, or information posted on the product page. If you see any errors in the information on the product page, please send us an email.

Reviews should not contain any of the following:

  • - HTML tags, profanity, obscenities, vulgarities, or comments that defame anyone
  • - Time-sensitive information such as tour dates, signings, lectures, etc.
  • - Single-word reviews. Other people will read your review to discover why you liked or didn't like the title. Be descriptive.
  • - Comments focusing on the author or that may ruin the ending for others
  • - Phone numbers, addresses, URLs
  • - Pricing and availability information or alternative ordering information
  • - Advertisements or commercial solicitation

Reminder:

  • - By submitting a review, you grant to Barnes & Noble.com and its sublicensees the royalty-free, perpetual, irrevocable right and license to use the review in accordance with the Barnes & Noble.com Terms of Use.
  • - Barnes & Noble.com reserves the right not to post any review -- particularly those that do not follow the terms and conditions of these Rules. Barnes & Noble.com also reserves the right to remove any review at any time without notice.
  • - See Terms of Use for other conditions and disclaimers.
Search for Products You'd Like to Recommend

Recommend other products that relate to your review. Just search for them below and share!

Create a Pen Name

Your Pen Name is your unique identity on BN.com. It will appear on the reviews you write and other website activities. Your Pen Name cannot be edited, changed or deleted once submitted.

 
Your Pen Name can be any combination of alphanumeric characters (plus - and _), and must be at least two characters long.

Continue Anonymously

    If you find inappropriate content, please report it to Barnes & Noble
    Why is this product inappropriate?
    Comments (optional)