Construction Scheduling, Cost Optimization and Management
Construction Scheduling, Cost Optimization and Management presents a general mathematical formula for the scheduling of construction projects. Using this formula, repetitive and non-repetitive tasks, work continuity considerations, multiple-crew strategies, and the effects of varying job conditions on the performance of a crew can be modelled. This book presents an entirely new approach to the construction scheduling problem. It provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization, including construction engineers, highway engineers, transportation engineers, contractors and architects. It will also be useful for researchers, and graduates on courses in construction scheduling and planning.
1128373792
Construction Scheduling, Cost Optimization and Management
Construction Scheduling, Cost Optimization and Management presents a general mathematical formula for the scheduling of construction projects. Using this formula, repetitive and non-repetitive tasks, work continuity considerations, multiple-crew strategies, and the effects of varying job conditions on the performance of a crew can be modelled. This book presents an entirely new approach to the construction scheduling problem. It provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization, including construction engineers, highway engineers, transportation engineers, contractors and architects. It will also be useful for researchers, and graduates on courses in construction scheduling and planning.
270.0
In Stock
5
1

Construction Scheduling, Cost Optimization and Management
338
Construction Scheduling, Cost Optimization and Management
338Hardcover
$270.00
270.0
In Stock
Product Details
ISBN-13: | 9780415244176 |
---|---|
Publisher: | Taylor & Francis |
Publication date: | 01/25/2001 |
Pages: | 338 |
Product dimensions: | 6.12(w) x 9.19(h) x (d) |
About the Author
What People are Saying About This
From the B&N Reads Blog