CPM Construction Scheduler's Manual

Overview

The project scheduler's survival kit. As a construction project scheduler,your decisions can mean the difference between big profits and financial disaster. Here's how to keep all your projects in the black: reach for Jonathan Hutching's CPM Construction Scheduler's Manual. It packs all the cutting-edge tools,techniques,insider secrets and strategies you need to "bulletproof" any construction project—commercial,residential,industrial,you name it. This on-the-job advisor includes a ready-to-use,lite version of ...
See more details below
Available through our Marketplace sellers.
Other sellers (Hardcover)
  • All (9) from $1.99   
  • New (3) from $61.09   
  • Used (6) from $1.99   
Close
Sort by
Page 1 of 1
Showing All
Note: Marketplace items are not eligible for any BN.com coupons and promotions
$61.09
Seller since 2008

Feedback rating:

(213)

Condition:

New — never opened or used in original packaging.

Like New — packaging may have been opened. A "Like New" item is suitable to give as a gift.

Very Good — may have minor signs of wear on packaging but item works perfectly and has no damage.

Good — item is in good condition but packaging may have signs of shelf wear/aging or torn packaging. All specific defects should be noted in the Comments section associated with each item.

Acceptable — item is in working order but may show signs of wear such as scratches or torn packaging. All specific defects should be noted in the Comments section associated with each item.

Used — An item that has been opened and may show signs of wear. All specific defects should be noted in the Comments section associated with each item.

Refurbished — A used item that has been renewed or updated and verified to be in proper working condition. Not necessarily completed by the original manufacturer.

New

Ships from: Chicago, IL

Usually ships in 1-2 business days

  • Standard, 48 States
  • Standard (AK, HI)
$68.00
Seller since 2009

Feedback rating:

(65)

Condition: New
New New as pictured-3.5" DISK IS SEALED, UNOPENED-clean, excellent condition, light corner rubbing, light shelf wear-Ships from legendary independent online bookstore in ... Murrieta, California. Thousands of satisfied customers. We ship promptly and Worldwide. We work hard to earn your confidence. Orders are fully guaranteed, includes free Tracking and Delivery Confirmation and normally ships the same business day. We use bubble wrap lined heavy Kraft envelopes. Reliable customer service and no-hassle return policy. Why pay more? Read more Show Less

Ships from: Diamond Bar, CA

Usually ships in 1-2 business days

  • Canadian
  • International
  • Standard, 48 States
  • Standard (AK, HI)
  • Express, 48 States
  • Express (AK, HI)
$137.74
Seller since 2015

Feedback rating:

(362)

Condition: New
Brand New Item.

Ships from: Chatham, NJ

Usually ships in 1-2 business days

  • Canadian
  • International
  • Standard, 48 States
  • Standard (AK, HI)
  • Express, 48 States
  • Express (AK, HI)
Page 1 of 1
Showing All
Close
Sort by
Sending request ...

Overview

The project scheduler's survival kit. As a construction project scheduler,your decisions can mean the difference between big profits and financial disaster. Here's how to keep all your projects in the black: reach for Jonathan Hutching's CPM Construction Scheduler's Manual. It packs all the cutting-edge tools,techniques,insider secrets and strategies you need to "bulletproof" any construction project—commercial,residential,industrial,you name it. This on-the-job advisor includes a ready-to-use,lite version of FastPro CPM Scheduler—sophisticated scheduling software that helps you create pro-quality spreadsheets,reports,contracts,schedules and more. It's your one-stop tool for developing reliable records and documents—ensuring jobsite quality control—reducing cost overruns—enhancing project safety—as well as mastering: critical path management; construction law; contract law; preconstruction planning; network velocity diagramming; scheduling contingencies; fast-tracking; dispute resolution; much more
Read More Show Less

Product Details

  • ISBN-13: 9780079122247
  • Publisher: McGraw-Hill School Education Group
  • Publication date: 12/28/1995
  • Pages: 353
  • Product dimensions: 8.78 (w) x 11.36 (h) x 1.32 (d)

Table of Contents

Acknowledgments
Foreword
Introduction
Ch. 1 Project Scheduler Overview 1
Ch. 2 Scheduling Systems 13
Ch. 3 Critical Path Management 25
Ch. 4 Network Scheduling 51
Ch. 5 Float 68
Ch. 6 Network Velocity Diagramming 77
Ch. 7 Fast-Tracking 91
Ch. 8 Business Combat 99
Ch. 9 Contract Law 113
Ch. 10 Construction Law 125
Ch. 11 Schedule Estimating 135
Ch. 12 Contract Conditions 143
Ch. 13 Preconstruction Planning 151
Ch. 14 Project Operations 157
Ch. 15 Software Program 167
Ch. 16 Project Scheduler Consultant 263
Ch. 17 Scheduling Contingencies 289
Ch. 18 Conclusion 305
Appendix A: Project Production Abbreviations 311
Appendix B: Industry Associations 325
Appendix C: EJCDC Table of Contract Standards 331
Index 345
Read More Show Less

Customer Reviews

Be the first to write a review
( 0 )
Rating Distribution

5 Star

(0)

4 Star

(0)

3 Star

(0)

2 Star

(0)

1 Star

(0)

Your Rating:

Your Name: Create a Pen Name or

Barnes & Noble.com Review Rules

Our reader reviews allow you to share your comments on titles you liked, or didn't, with others. By submitting an online review, you are representing to Barnes & Noble.com that all information contained in your review is original and accurate in all respects, and that the submission of such content by you and the posting of such content by Barnes & Noble.com does not and will not violate the rights of any third party. Please follow the rules below to help ensure that your review can be posted.

Reviews by Our Customers Under the Age of 13

We highly value and respect everyone's opinion concerning the titles we offer. However, we cannot allow persons under the age of 13 to have accounts at BN.com or to post customer reviews. Please see our Terms of Use for more details.

What to exclude from your review:

Please do not write about reviews, commentary, or information posted on the product page. If you see any errors in the information on the product page, please send us an email.

Reviews should not contain any of the following:

  • - HTML tags, profanity, obscenities, vulgarities, or comments that defame anyone
  • - Time-sensitive information such as tour dates, signings, lectures, etc.
  • - Single-word reviews. Other people will read your review to discover why you liked or didn't like the title. Be descriptive.
  • - Comments focusing on the author or that may ruin the ending for others
  • - Phone numbers, addresses, URLs
  • - Pricing and availability information or alternative ordering information
  • - Advertisements or commercial solicitation

Reminder:

  • - By submitting a review, you grant to Barnes & Noble.com and its sublicensees the royalty-free, perpetual, irrevocable right and license to use the review in accordance with the Barnes & Noble.com Terms of Use.
  • - Barnes & Noble.com reserves the right not to post any review -- particularly those that do not follow the terms and conditions of these Rules. Barnes & Noble.com also reserves the right to remove any review at any time without notice.
  • - See Terms of Use for other conditions and disclaimers.
Search for Products You'd Like to Recommend

Recommend other products that relate to your review. Just search for them below and share!

Create a Pen Name

Your Pen Name is your unique identity on BN.com. It will appear on the reviews you write and other website activities. Your Pen Name cannot be edited, changed or deleted once submitted.

 
Your Pen Name can be any combination of alphanumeric characters (plus - and _), and must be at least two characters long.

Continue Anonymously

    If you find inappropriate content, please report it to Barnes & Noble
    Why is this product inappropriate?
    Comments (optional)