Delay Analysis in Construction Contracts / Edition 1

Hardcover (Print)
Used and New from Other Sellers
Used and New from Other Sellers
from $89.04
Usually ships in 1-2 business days
(Save 40%)
Other sellers (Hardcover)
  • All (13) from $89.04   
  • New (10) from $94.28   
  • Used (3) from $86.88   

Overview

The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct result of each event, can be difficult and complex.

This book is a practical guide to the process of delay analysis and includes an in-depth review of the primary methods of delay analysis, together with the assumptions that underlie the precise calculations required in any quantitative delay analysis. The techniques discussed can be used on projects of any size, under all forms of construction contract, both domestic and international.

The authors discuss not only delay analysis techniques, but also their appropriateness under given circumstances, demonstrating how combined approaches may be applied where necessary. They also consider problematic issues including 'who owns the float', concurrent delay, early completion programmes, and disruption. The book, which is well illustrated, features practical worked examples and case studies demonstrating the techniques commonly used by experienced practitioners.

This is an invaluable resource to contractors, architects, engineers, surveyors, programmers and delay analysts, and will also be of interest to clients' professional advisors managing extension of time or delay claims, as well as construction lawyers who require a better understanding of the underlying assumptions on which many quantitative delay analyses are based.

Read More Show Less

Editorial Reviews

From the Publisher
"This book provides an interesting insight into programming, planning and delay analysis terminology and techniques and is therefore a useful addition to the library of both students and practitioners." (The Expert and Dispute Resolver, Spring 2009)

"John Kean and Anthony Caletka are pukka analysts in that tricky area of delays, programming and extension of time. I highly recommend their book Delay Analysis in Construction Contracts. Both authors have extensive experience … .Buy the book." (Building Magazine, February 2009)

"The book's stated purpose is to provide a practical guide for those interested in schedule delay analysis. It provides a good in-depth review of the most common delay analysis techniques.... An excellent book, full of practical tips for the reader and very timely in its publication. it is well worth cost and a good read for anyone involved in schedule delay analysis." (Cost Engineering, February 2009)

Read More Show Less

Product Details

  • ISBN-13: 9781405156547
  • Publisher: Wiley
  • Publication date: 9/16/2008
  • Edition description: New Edition
  • Edition number: 1
  • Pages: 288
  • Product dimensions: 7.00 (w) x 9.60 (h) x 1.00 (d)

Meet the Author

Dr. P. John Keane, chairman of Keane Associates, has thirty years' experience in the construction industry and is also an experienced arbitrator.

Anthony F. Caletka, PE, CFCC, CCM, is a managing director at PricewaterhouseCoopers and has twenty four years' experience in project and construction management, particularly on large civil engineering projects. He has had extensive experience of construction arbitration, litigation and dispute review boards and was a member of the SCL Delay and Disruption Protocol drafting committee.

Read More Show Less

Table of Contents

Preface.

1 Introduction.

1.1 General.

1.1.1 Purpose of ‘delay analysis in construction’.

1.1.2 Guidance.

1.1.3 Construction planning and programming.

1.2 Construction delays.

1.2.1 Identifying delays.

1.2.2 Analysing construction delays.

1.2.3 Delay claim life-cycle.

1.3 Burning issues in delay analysis.

1.4 Presentation and case study.

2 Construction Programmes.

2.1 Introduction.

2.1.1 Planning, Programming and Project Controls.

2.1.2 Elements of a successful project.

2.2 Planning and Programming.

2.2.1 Project Planning.

2.2.2 Work Breakdown Structure.

2.3 CPM Programming Techniques; the Fundamentals.

2.3.1 Activity Durations.

2.3.2 Activity Relationships.

2.3.3 Event Date Calculations.

2.3.4 Forward Pass.

2.3.5 Backward Pass.

2.3.6 Total Float.

2.3.7 Constraints.

2.4 Baseline Validation.

2.4.1 Joint Baseline Review.

2.4.2 Programme Approval.

2.4.3 The Project Baseline.

2.5 Other Planning Techniques.

2.5.1 PERT – Project Evaluation and Review Technique.

2.5.2 Gantt Charts (Bar Charts).

2.5.3 Line of Balance.

2.5.4 Critical Chain Method/Theory of Constraints.

2.6 Why use CPM Planning or Scheduling Techniques?.

2.6.1 Project Management.

2.6.2 As-planned programmes.

2.7 Project Controls and the Project Control Cycle.

2.7.1 Progress Monitoring.

2.7.2 Process and Analyse Information, Earned Value Method.

2.7.3 The Cost and Schedule Performance Curves.

2.7.4 Time Control.

2.7.5 Programme Updates.

2.8 Records, Records, Records….

2.8.1 Electronic Records.

2.9 Predatory Programming Practices.

2.10 Guidance.

3 Identification of Construction Delays.

3.1 Establishing a Basis for Identifying Delay.

3.1.1 General Requirements.

3.1.2 Validation of an As-Planned Programme.

3.2 Factual Evidence and As-Built Programmes.

3.2.1 As-Built Programme Preparation.

3.2.2 Summary.

3.3 Identification of Delay Events.

3.3.1 Delay Identification.

3.3.2 Recording Delays.

3.4 Identification and Analysis of Disruption.

3.4.1. Disruption and Delay.

3.4.2 Calculating Disruption.

3.4.3 Establishing Cause.

3.4.4 Total Cost Claims/Global Claims.

3.4.5 Measured Mile.

3.4.6 Graphical Presentation.

3.4.7 Summary.

4 Analysis of Construction Delays.

4.1 Introduction to Delay Analysis Techniques.

4.1.1 The use of CPM techniques.

4.1.2 Project Planning Software.

4.1.3 Identifying Delays – Cause or Effect?.

4.2 Explanation of the Available Techniques.

4.2.1 Additive Methods of Delay Analysis.

4.2.2 Impacted As-Planned.

4.2.3 Time Impact Analysis.

4.2.4 Collapsed As-Built.

4.2.5 As-Built Based Methods of Analysis.

4.2.6 Total Time Assessments.

4.2.7 As-Planned versus As-Built Windows Analysis.

4.2.8 Contemporaneous Windows Analysis.

4.2.9 Month-to-Month Update Analysis.

4.3 Selection Criteria and Guidance.

4.3.1 The SCL Delay and Disruption Protocol.

4.3.2 The Core Statements of Principle.

4.3.3 Recommended Practice No. 29R-03 ‘Forensic Schedule Analysis’.

4.3.4 Which technique to use under given circumstances.

4.4 Summary.

5 Problematic Issues.

5.1 Introduction.

5.2 Float and Delay Claims.

5.2.1 General Definitions — What is ‘Float’?.

5.2.2 How Float is used.

5.2.3 Float Loss and the Impact.

5.2.4 Measurement of Float Loss.

5.2.5 Who Owns the Float?.

5.3 Concurrency.

5.3.1 Definitions.

5.3.2 Delay Analysis and Concurrency.

5.3.3 SCL Delay and Disruption Protocol.

5.3.4 Delay Scenarios.

5.3.5 Common Questions.

5.3.6 Experience and Commonsense.

5.3.7 The Concept of Pacing.

5.4 Programme Approvals and Onerous Specifications.

5.4.1 Programme Requirements, Format and Compliance.

5.4.2 Approval or Acceptance of Construction Programme.

5.5 Acceleration and Mitigation.

5.5.1 Mitigation.

5.5.2 Acceleration.

5.5.3 Contractors’ right to early completion.

6 Effective Presentation of Delay Analysis.

6.1 Introduction.

6.2 Case Study – Airport Terminal Expansion.

6.2.1 Initial analysis by party appointed planning experts.

6.2.2 Using Time Impact Analysis for Prolongation.

6.2.3 Tribunal Planning Expert’s Contemporaneous Approach.

6.2.4 Runway Extension - Are delays to the Runway Extension relevant?.

6.2.5 Terminal Building – Are delays to the Terminal Building relevant?.

6.3 Float Mapping - Approach and Methodology.

6.3.1 Extracting Float Values.

6.3.2 Create Float Map.

6.3.3 Identify Driving Activities.

6.3.4 As-Built Critical Path.

6.4 Demonstrating Acceleration.

6.5 Presentation Skills – Demonstrative Evidence.

6.5.1 Summary.

Index

Read More Show Less

Customer Reviews

Be the first to write a review
( 0 )
Rating Distribution

5 Star

(0)

4 Star

(0)

3 Star

(0)

2 Star

(0)

1 Star

(0)

Your Rating:

Your Name: Create a Pen Name or

Barnes & Noble.com Review Rules

Our reader reviews allow you to share your comments on titles you liked, or didn't, with others. By submitting an online review, you are representing to Barnes & Noble.com that all information contained in your review is original and accurate in all respects, and that the submission of such content by you and the posting of such content by Barnes & Noble.com does not and will not violate the rights of any third party. Please follow the rules below to help ensure that your review can be posted.

Reviews by Our Customers Under the Age of 13

We highly value and respect everyone's opinion concerning the titles we offer. However, we cannot allow persons under the age of 13 to have accounts at BN.com or to post customer reviews. Please see our Terms of Use for more details.

What to exclude from your review:

Please do not write about reviews, commentary, or information posted on the product page. If you see any errors in the information on the product page, please send us an email.

Reviews should not contain any of the following:

  • - HTML tags, profanity, obscenities, vulgarities, or comments that defame anyone
  • - Time-sensitive information such as tour dates, signings, lectures, etc.
  • - Single-word reviews. Other people will read your review to discover why you liked or didn't like the title. Be descriptive.
  • - Comments focusing on the author or that may ruin the ending for others
  • - Phone numbers, addresses, URLs
  • - Pricing and availability information or alternative ordering information
  • - Advertisements or commercial solicitation

Reminder:

  • - By submitting a review, you grant to Barnes & Noble.com and its sublicensees the royalty-free, perpetual, irrevocable right and license to use the review in accordance with the Barnes & Noble.com Terms of Use.
  • - Barnes & Noble.com reserves the right not to post any review -- particularly those that do not follow the terms and conditions of these Rules. Barnes & Noble.com also reserves the right to remove any review at any time without notice.
  • - See Terms of Use for other conditions and disclaimers.
Search for Products You'd Like to Recommend

Recommend other products that relate to your review. Just search for them below and share!

Create a Pen Name

Your Pen Name is your unique identity on BN.com. It will appear on the reviews you write and other website activities. Your Pen Name cannot be edited, changed or deleted once submitted.

 
Your Pen Name can be any combination of alphanumeric characters (plus - and _), and must be at least two characters long.

Continue Anonymously
Sort by: Showing 1 Customer Reviews
  • Anonymous

    Posted August 11, 2010

    No text was provided for this review.

Sort by: Showing 1 Customer Reviews

If you find inappropriate content, please report it to Barnes & Noble
Why is this product inappropriate?
Comments (optional)