Integrating Kanban with MRP II: Automating a Pull System for Enhanced JIT Inventory Management

Paperback (Print)
Buy New
Buy New from BN.com
$46.89
Used and New from Other Sellers
Used and New from Other Sellers
from $32.87
Usually ships in 1-2 business days
(Save 37%)
Other sellers (Paperback)
  • All (6) from $32.87   
  • New (2) from $48.72   
  • Used (4) from $32.87   

More About This Textbook

Overview

If you manage inventory, you probably use MRPII, a system based on a push method that embraces work and purchase order execution. MRPII helps you plan and integrate data relevant to your entire organization. But, when you have shifts in demand, you have to: 1) Realign and cancel hundreds of open manufacturing and purchase orders, and then 2) issue new orders.

Another system, kanban, is designed specifically to replenish inventory in just-in-time manufacturing. As consumption occurs, the kanban manual system triggers replenishment signals to the source of supply, so that both production and the supplier are constantly reacting to actual consumption. Compared to MRPII, kanban lowers inventory and minimizes shortages. But the manual process of recalculating every part number by hand, and triggering replenishment by faxing or calling suppliers, is time consuming and non-value-adding.

Automating kanban by blending the planning strength of MRPII with manual kanban pull methods enhances your flexibility and competitive position.

MRP's forward projection capability is used to:

  • recalculate kanban lot size.
  • perform a simulation to protect against non-linear demand.
  • inform production areas and suppliers of the anticipated demand levels for resource planning.
  • calculate staffing requirements for flexible work cells.

This system:

  • Automatically recalculates and triggers replenishment.
  • Integrates suppliers into the manufacturing loop.
  • Uses bar codes to enhance speed and accuracy of the receipt process.

Before moving in this direction, preparatory work is required. Work cells should be constructed with material located at the point of use. Container options and transportation methods need to be selected, kanban lot size calculations, and work cell staffing modules to develop. This book will help you deal with these and other topics. You will be able to take advantage of the author's expertise in the design, implementation and evaluation of these systems.

Read More Show Less

Product Details

  • ISBN-13: 9781563273230
  • Publisher: Taylor & Francis
  • Publication date: 9/15/1997
  • Edition description: New Edition
  • Pages: 248
  • Product dimensions: 5.90 (w) x 8.80 (h) x 0.70 (d)

Table of Contents

  1. Eliminate Replenishment System Waste
  2. Replenishment System Basics
  3. Automated Kanban — The Automated Flow Technology
  4. Kanban Prerequisites — WCM Techniques
  5. Implementing Kanban
  6. Kanban and MRPII System Integration
  7. AFT Calculations for Determining Kanban Lot Sizes and Staffing Levels
  8. Perpetuation of the Automated Kanban System
  9. Key Topics of the Automated Kanban System
  10. Three examples of AFT Implementation
Read More Show Less

Customer Reviews

Be the first to write a review
( 0 )
Rating Distribution

5 Star

(0)

4 Star

(0)

3 Star

(0)

2 Star

(0)

1 Star

(0)

Your Rating:

Your Name: Create a Pen Name or

Barnes & Noble.com Review Rules

Our reader reviews allow you to share your comments on titles you liked, or didn't, with others. By submitting an online review, you are representing to Barnes & Noble.com that all information contained in your review is original and accurate in all respects, and that the submission of such content by you and the posting of such content by Barnes & Noble.com does not and will not violate the rights of any third party. Please follow the rules below to help ensure that your review can be posted.

Reviews by Our Customers Under the Age of 13

We highly value and respect everyone's opinion concerning the titles we offer. However, we cannot allow persons under the age of 13 to have accounts at BN.com or to post customer reviews. Please see our Terms of Use for more details.

What to exclude from your review:

Please do not write about reviews, commentary, or information posted on the product page. If you see any errors in the information on the product page, please send us an email.

Reviews should not contain any of the following:

  • - HTML tags, profanity, obscenities, vulgarities, or comments that defame anyone
  • - Time-sensitive information such as tour dates, signings, lectures, etc.
  • - Single-word reviews. Other people will read your review to discover why you liked or didn't like the title. Be descriptive.
  • - Comments focusing on the author or that may ruin the ending for others
  • - Phone numbers, addresses, URLs
  • - Pricing and availability information or alternative ordering information
  • - Advertisements or commercial solicitation

Reminder:

  • - By submitting a review, you grant to Barnes & Noble.com and its sublicensees the royalty-free, perpetual, irrevocable right and license to use the review in accordance with the Barnes & Noble.com Terms of Use.
  • - Barnes & Noble.com reserves the right not to post any review -- particularly those that do not follow the terms and conditions of these Rules. Barnes & Noble.com also reserves the right to remove any review at any time without notice.
  • - See Terms of Use for other conditions and disclaimers.
Search for Products You'd Like to Recommend

Recommend other products that relate to your review. Just search for them below and share!

Create a Pen Name

Your Pen Name is your unique identity on BN.com. It will appear on the reviews you write and other website activities. Your Pen Name cannot be edited, changed or deleted once submitted.

 
Your Pen Name can be any combination of alphanumeric characters (plus - and _), and must be at least two characters long.

Continue Anonymously

    If you find inappropriate content, please report it to Barnes & Noble
    Why is this product inappropriate?
    Comments (optional)