Precedence and Arrow Networking Techniques for Construction
Two important scheduling techniques for modern construction management—the precedence technique and the arrow technique—are developed and analyzed. The parallel treatment of these two applications presents a basis of theory and practice for the civil engineering student and the practicing project manager. Introduces the concept of the scheduling plan as a design process. Shows the steps for developing the list of activities as the basis for any networking technique. Gives computations for arrow and precedence diagrams. Covers practical techniques for making time-cost adjustments to early start schedules. Concludes with discussion of applications of techniques in the context of real-life projects.
1103823854
Precedence and Arrow Networking Techniques for Construction
Two important scheduling techniques for modern construction management—the precedence technique and the arrow technique—are developed and analyzed. The parallel treatment of these two applications presents a basis of theory and practice for the civil engineering student and the practicing project manager. Introduces the concept of the scheduling plan as a design process. Shows the steps for developing the list of activities as the basis for any networking technique. Gives computations for arrow and precedence diagrams. Covers practical techniques for making time-cost adjustments to early start schedules. Concludes with discussion of applications of techniques in the context of real-life projects.
302.75 In Stock
Precedence and Arrow Networking Techniques for Construction

Precedence and Arrow Networking Techniques for Construction

by Robert B. Harris
Precedence and Arrow Networking Techniques for Construction

Precedence and Arrow Networking Techniques for Construction

by Robert B. Harris

Paperback

$302.75 
  • SHIP THIS ITEM
    In stock. Ships in 1-2 days.
  • PICK UP IN STORE

    Your local store may have stock of this item.

Related collections and offers


Overview

Two important scheduling techniques for modern construction management—the precedence technique and the arrow technique—are developed and analyzed. The parallel treatment of these two applications presents a basis of theory and practice for the civil engineering student and the practicing project manager. Introduces the concept of the scheduling plan as a design process. Shows the steps for developing the list of activities as the basis for any networking technique. Gives computations for arrow and precedence diagrams. Covers practical techniques for making time-cost adjustments to early start schedules. Concludes with discussion of applications of techniques in the context of real-life projects.

Product Details

ISBN-13: 9780471041238
Publisher: Wiley
Publication date: 01/16/1991
Pages: 448
Product dimensions: 6.34(w) x 9.19(h) x 1.06(d)

About the Author

Robert B. Harris was an American multihull sailboat designer.

Table of Contents

Introduction.

Project Breakdown.

Basic Arrow Diagraming.

Basic Precedence Diagraming.

Establishing Activity Durations.

Scheduling Computations for Arrow Networks.

Scheduling Computations for Precedence Networks.

Communicating the Schedule.

Project Control.

Time-Cost Adjustments.

Resource Leveling.

Program Evaluation and Review Technique (PERT).

Overlapping Networks.

Index.
From the B&N Reads Blog

Customer Reviews