Progress in Improving Project Management at the Department of Energy: 2002 Assessment available in Paperback

Progress in Improving Project Management at the Department of Energy: 2002 Assessment
- ISBN-10:
- 0309089093
- ISBN-13:
- 9780309089098
- Pub. Date:
- 07/13/2003
- Publisher:
- National Academies Press
- ISBN-10:
- 0309089093
- ISBN-13:
- 9780309089098
- Pub. Date:
- 07/13/2003
- Publisher:
- National Academies Press

Progress in Improving Project Management at the Department of Energy: 2002 Assessment
Paperback
Buy New
$43.00-
SHIP THIS ITEMIn stock. Ships in 1-2 days.PICK UP IN STORE
Your local store may have stock of this item.
Available within 2 business hours
Overview
Product Details
ISBN-13: | 9780309089098 |
---|---|
Publisher: | National Academies Press |
Publication date: | 07/13/2003 |
Pages: | 125 |
Product dimensions: | 6.00(w) x 9.00(h) x 0.40(d) |
Read an Excerpt
Progress in Improving Project Management at the Department of Energy
2002 Assessment
NATIONAL ACADEMIES PRESS
Copyright © 2003 National Academy of Sciences
All right reserved.
ISBN: 978-0-309-08909-8
Chapter One
Executive Summary
This report is the second in a series of three annual assessments of project management at the U.S. Department of Energy (DOE). The first annual report assessed progress through mid-2001 (NRC, 2001b), and this report continues the assessment through October 2002. The assessments are being made by the National Research Council's (NRC's) Committee for Oversight and Assessment of U.S. Department of Energy Project Management. The committee has also produced two interim letter reports (NRC, 2001a, 2002a) and the proceedings of a government/ industry forum on the owner's role in project management and preproject planning (NRC, 2002b). All of these reports follow up on the recommendations made by a predecessor committee in its report Improving Project Management in the Department of Energy (NRC, 1999). Although the detailed discussion, findings, and recommendations in the previous reports are not repeated in this report, the committee continues to endorse them, and they should be read in conjunction with this report.
The reader who has persevered through this series of publications will have observed that it becomes more and more difficult to find new things to sayabout project management at the DOE. Chapter 2 discusses some fundamental issues in DOE's core competencies that are identified in this and previous reports. The fundamental best practices cited as the benchmarks in the 1999 report have not changed, and the committee's primary emphasis remains the importance of learning the fundamentals of project management good practice and applying them consistently.
Since the current committee was established, there have been a number of senior management and other personnel changes at the DOE, as well as changes in DOE's approach to project management. For the most part, the committee applauds these new directions in project management. The committee recommends that the project management changes in DOE Order O 413.3, Program and Project Management for the Acquisition of Capital Assets, in the draft Program and Project Management manual (DOE, 2000, 2002) and in other recent directives and memoranda be continued until they have had time to be effective. The committee's specific findings and recommendations regarding these documents and procedures are given in Chapter 3 of this report. The summary message here is simple: DOE should persevere in its efforts to make project management a core competency and to achieve excellence in project performance. The committee recognizes that the time required for cultural change in the DOE may be longer than that required in industrial companies, where market forces drive improvement. DOE needs to maintain the project management policies and procedures it has defined long enough to convince both DOE and contractor personnel that the changes are permanent. This report describes the progress the committee has observed and the issues that need further efforts to make DOE a leading project management organization.
Since the earliest report (NRC, 1999), NRC committees have been concerned not only that DOE is doing projects right but also that it is doing the right projects. Perhaps the most important single point that the committee has stressed, and continues to stress, is the absolute need for DOE management to develop the strategic plans that define the need for capital acquisition projects. Although the committee's reports, this one included, have dealt with many specific issues affecting project success (e.g., front-end planning, risk management, and contracting strategies), the overriding critical success factor for projects is to assure that projects are essential to and aligned with the DOE's mission (i.e., that the right portfolio of projects is selected). DOE is perhaps improving, as indicated by the recent establishment of the Office of Management and Budget Evaluation (OMBE), and there has been some progress in the National Nuclear Security Administration (NNSA) with the integrated construction project plan (ICPP) and, more recently, in the Office of Environmental Management (EM), but the department is still lacking a continuous and strong portfolio planning and management process. Portfolio planning is to programs as project planning is to projects, at a higher level. With a functional portfolio management process, all echelons in DOE would know what projects to do and the priorities given to them. At least as important, a portfolio management process would implicitly define what projects not to do and would help to insulate DOE from the political pressures brought by would-be contractors and other economic beneficiaries to engage in unnecessary and unwarranted projects.
The committee also emphasizes the role of DOE's senior management in inculcating the belief throughout the organization that projects can and will be managed effectively. The instrument in the hands of senior management that will lead to better project management is the Energy Systems Acquisition Advisory Board (ESAAB) critical decision process. Chapter 7 discusses some means by which DOE management can determine whether even a first-of-a-kind project is ready to proceed. The role of senior managers in shaping DOE's project management culture is discussed further in Chapter 6 of this report. The committee finds that progress has been made in this area, but additional work is needed to achieve the desired cultural changes.
The committee notes that NNSA in particular has made progress in defining its mission and developing a strategic direction. EM, since completion of its top-to-bottom review, has made considerable progress in recognizing that its projects are manageable-an important first step and a prerequisite to any improvement in project management. The Office of Science (SC), too, recognizes the need for improvement of its project management. Additionally, the formation of OMBE has strengthened the strategic oversight of all DOE programs and projects and has justified the placement of the Office of Engineering and Construction Management (OECM) in the Office of the Chief Financial Officer (CFO). As recommended by the 1999 NRC report, there is now a headquarters organization with some responsibility for project management agency-wide. The committee also applauds DOE's steps to recognize improvements in project management (Chapter 10). The committee believes that DOE has made some progress toward satisfying the recommendation made in the 1999 report-namely, that DOE needs to be doing the right projects as well as doing projects right. DOE policies and procedures, at least, emphasize the federal government's role in deciding which projects to do, how to select projects from the large number of proposals, and how to manage the portfolio of projects, leaving the details of how to do them to the contractors.
DOE expends about 95 percent of its funds through contractors. If this portion were reduced to 90 percent, it would be a reduction of about 5 percent for the contractors but an increase of 100 percent for DOE. Clearly, this is not going to happen; DOE will continue to remain dependent on contractors to run its facilities and its projects. Therefore, the committee, in the past and in Chapter 5 and Appendix D of this report, has strongly emphasized the owner's role in project management, by which DOE, as the custodian of public funds, should not abrogate to contractors project definition, acquisition strategy decisions, and project oversight. To effectively fulfill its project management responsibilities, DOE needs to expand its investment in human capital to develop a corps of qualified project managers commensurate with the value and complexity of its projects. The committee believes that an appropriate role for DOE as owner has yet to be completely defined.
The DOE, by its own analysis (DOE Contract Reform and Privatization Project Office, 2001), draws on an ever-shrinking pool of contractors to accomplish its work. DOE has stressed contractor competition as one of the means for overcoming its lack of project management experience. Where competitive bidding is determined to be the preferred method of procurement, DOE should take steps to obtain adequate numbers of bids if there are qualified contractors capable of undertaking the projects. However, there is a shrinking pool of qualified contractors, and this trend is alarming. As real competition declines, the need for knowledgeable, trained, professional federal project managers inside DOE increases. The apparent shortage of such personnel in DOE has been identified before and is addressed in Chapter 4, on human capital. Further findings and recommendations on acquisition and contracting are discussed in Chapter 9.
This report continues to offer recommendations regarding project management methodology and project oversight, which are listed at the end of each chapter, where the relevant supporting information is presented. (See, in Chapter 1, "Organization of the Report," for an outline of the chapters where these specific recommendations are made.) These are essential tools, but they will be effective only insofar as there are competent DOE managers with the will to use them. The committee's view is that a corrective course has been set from the bridge, but it is still too early to tell if the ship is responding.
(Continues...)
Excerpted from Progress in Improving Project Management at the Department of Energy Copyright © 2003 by National Academy of Sciences. Excerpted by permission.
All rights reserved. No part of this excerpt may be reproduced or reprinted without permission in writing from the publisher.
Excerpts are provided by Dial-A-Book Inc. solely for the personal use of visitors to this web site.
Table of Contents
Contents EXECUTIVE SUMMARY....................1
1 INTRODUCTION....................5
Review Activities....................6
Organization of the Report....................6
References....................8
2 CORE COMPETENCIES....................9
Introduction....................9
Areas of Progress....................9
Areas of Concern....................11
References....................14
3 DOE ORDER O 413.3 AND THE PROGRAM AND PROJECT MANAGEMENT MANUAL....................15
Introduction....................15
Analysis of Current Status and Direction....................15
Findings and Recommendations....................17
References....................18
4 HUMAN CAPITAL....................19
Introduction....................19
Knowledge, Skills, and Abilities....................19
Federal Workforce Trends....................21
Training and Career Development....................23
Findings and Recommendations....................25
References....................27
5 DOE'S ROLE AS OWNER....................28
Introduction....................28
Government/Industry Forum on the Owner's Role....................28
Federal Project Managers' Functions....................30
Findings and Recommendations....................31
References....................32
6 DOE PROJECT MANAGEMENT CULTURE....................33
Introduction....................33
Leadership....................34
Acceptance of Change Within the DOE Culture....................36
Overcoming Resistance to Cultural Change....................38
Findings and Recommendations....................39
References....................39
7READINESS TO PROCEED FOR FIRST-OF-A-KIND PROJECTS....................40
Introduction....................40
Characteristics of First-of-a-Kind Projects....................41
Challenges That Arise in First-of-a-Kind Projects....................42
Critical Decisions....................44
Management Planning and Control....................47
Findings and Recommendations....................48
8 PROJECT CYCLE TIME REDUCTION....................49
Introduction....................49
Prerequisites for Reducing Cycle Time....................49
Effect of DOE Order O 413.3 on Project Cycle Time....................50
Eliminating Delays from Critical Decisions....................52
Complexity Increases the Risk of Delays....................53
Reducing Project Time and Supportive Management Culture....................54
Staffing for Reduced Project Cycle Time....................54
Findings and Recommendations....................55
References....................56
9 ACQUISITION AND CONTRACTING....................57
Introduction....................57
Developing an Acquisition Strategy....................58
Performance-Based Contracting....................60
Incentives....................63
Findings and Recommendations....................64
References....................66
10 RECOGNIZING PROJECT MANAGEMENT SUCCESSES....................67
Introduction....................67
2002 Project Awards....................67
Other Notable Projects....................70
Common Factors....................71
Findings and Recommendations....................71
References....................72
APPENDIXES A Statement of Task....................75
B Biographies of Committee Members....................76
C Committee Fact Finding and Briefing Activities and Documents Reviewed from October 2001 Through October 2002....................82
D Characteristics of Effective Owners' Representatives....................92
E Key Questions for Readiness to Proceed....................96
F Building Flexibility into Projects to Manage Uncertainty....................108