ISBN-10:
0470512644
ISBN-13:
9780470512647
Pub. Date:
11/09/2007
Publisher:
Wiley
The Restoration Handbook / Edition 1

The Restoration Handbook / Edition 1

by Enric Rosello

Hardcover

Current price is , Original price is $53.95. You

Temporarily Out of Stock Online

Please check back later for updated availability.

This item is available online through Marketplace sellers.

Product Details

ISBN-13: 9780470512647
Publisher: Wiley
Publication date: 11/09/2007
Pages: 276
Product dimensions: 8.30(w) x 11.30(h) x 0.90(d)

About the Author

Enric Roselló is an experienced sailor and nautical journalist in Spain.

Read an Excerpt

Click to read or download

Table of Contents

Foreword.

Preface.

1. Jobs to be done: In search of a new youth.

2. On dry land: High and dry, stripped out and inventory.

3. Stripping out interiors: The good news and the bad.

4. Osmosis: An inevitable problem.

5. Electrical installation (1 of 3) : Planning the new installation.

6. Repairing the deck (1 of 3): Preparing the ground.

7. Repairing the deck (2 of 3): Filling holes.

8. Electrical installation (2 of 3): Fitting.

9. Replacing Perspex side-windows: A breath of fresh air.

10. Anchor locker (1 of 2): A support for the windlass.

11. Repairing the deck (3 of 3): Hatches and thru-hulls.

12. Mast (1 of 3): Turning the old into new.

13. Cleaning the winches: Pulling power.

14. Painting the interiors: A touch of colour.

15. Engine (1 of 2): Time for a change.

16. Bow pulpit: A touch of haute couture.

17. Refi tting the head: A complete rethink.

18. Bottom: A new epoxy skin.

19. Painting topsides: Beauty treatment.

20. Painting the deck: The icing on the cake.

21. Deck hardware (1 of 4): Putting her back together.

22. Interior carpentry (1 of 7): Design and planning.

23. Deck hardware (2 of 4): Winches, deck organisers and rope clutches.

24. Interior carpentry (2 of 7): The value of experience.

25. Interior carpentry (3 of 7): Setting the scene.

26. Installing the electronics: Here’s to modernity.

27. Renewing upholstery and foam fi llings: A question of comfort.

28. Installing the refrigerator: On-board cold.

29. Plumbing (1 of 2): Pressurised freshwater system.

30. Plumbing (2 of 2): Bilge systems.

31. Deck hardware (3 of 4): Advancing on various fronts.

32. Mast (2 of 3): Ready to raise the mast.

33. Mast (3 of 3): Installing a furler.

34. Interior carpentry (4 of 7): Soles, table and sides.

35. Engine (2 of 2): Engine replacement.

36. Lining ceilings and walls: Plenty of craftsmanship.

37. Anchor locker (2 of 2): Readying the bow.

38. Deck hardware (4 of 4): Objective accomplished.

39. Interior carpentry (5 of 7): Galley: from start to fi nish.

40. Electrical installation (3 of 3): Finishes and testing.

41. Sails: Updating the canvas.

42. Interior carpentry (6 of 7): Never-ending finishes.

43. Interior carpentry (7 of 7): Attention to detail.

44. Final tally: Done!

45. Appendix I: Waste management: A more ecological toilet.

46. Appendix II: Steering system: Appearances can be misleading.

Customer Reviews

Most Helpful Customer Reviews

See All Customer Reviews