Multi-Stage Simultaneous Lot-Sizing and Scheduling: Planning of Flow Lines with Shifting Bottlenecks
Paperback
$54.99
Premium Members save an extra 10% and all Members collect stamps to save with Rewards. 10 stamps = $5.Learn More
In stock
This item is currently out of stock online.
Not Eligible for Free ShippingSelect a store to view item availability.
Due to a varying product demand (changing product mix) and different production speeds, bottlenecks may shift between the stages. In that case, a simultaneous lot-sizing and scheduling of these stages is recommendable. Hence, an improved version of the General Lot-Sizing and Scheduling Problem for Multiple production Stages (GLSPMS) was developed. Moreover, several reformulation techniques were applied to this model to solve it exactly. Besides, a new meta-heuristic which combines the princ...






















