Spillway Design - Step by Step
Paperback
$68.99
Premium Members save an extra 10% and all Members collect stamps to save with Rewards. 10 stamps = $5.Learn More
Select a store to view item availability.
Most dam accidents with hydroelectric plants are due to under-dimensioning of the maximum floods of spillway design, causing extravasation and dam breaks (this occurs in 23% of the accidents). This work highlights the relationship between spillway design and potential dam failure and other important aspects of these structures and presents the methodology of design based on the international experience on the subject.
The book covers river basin studies and floods (the geology, geomorpholog...






















